Blakely construction started this job with siteworks in Sep 2013 and began process of starting pond development this process starts with digging the ponds to required depth sourcing and screening silt and then laying that silt in the bottom of the pond in a 300mm layer that followed by installing a geosynthetic bentonite cloth and then finally that’s all covered with 150mm of topsoil and sand mix then 150mm of screened topsoil and sow with a micro clover .

This job was in a hard to access location sandwiched between Christchurch’s new southern motorway and the new Wigram subdivision.

This made it important for the site to be tidy at all times so not to involve public scrutiny being in easy view of 1000s of people a day.